Midfield Terminal Building – Abu Dhabi Internation Airport

Scope of Work:

Installation of gravity drain pipes with all accessories including Fit-up, erection, welding, insulation, jacket, field joint insulation and pressure testing as specified in the project specification and drawings.

ClientPCE JV
LocationMidfield terminal building, Abu Dhabi